Some of our recently completed projects are outlined below -

BP Refinery, Kwinana
Fixed fire protection project. Prepare DCS I/O Schematic Diagrams for 120 flame and gas detectors
WMC Knickel Refinery, Kwinana
Gas fired No2 Sinter Furnace upgrade. Prepare P&ID Diagrams, DCS Termination Diagrams, Loop Diagrams, Equipment Layouts, Cable Schedules etc. Tie in to existing relay control circuits for hardwired safety shutdown.
Western Power Corporation
Regional Power Division
Norseman Town Feeders upgrade project. Refurbish existing 11kV OCB panels with new protection relay, power monitor and telemetry. From information gathered on site visit prepared schematic diagram, sheet metal detail drawings, underground and overhead cable route drawing, materials list and work scope.
Tyco Water, Kwinana
Prepare 50 as-built electrical schematics, termination diagrams, control panel GAs and cable schedules for Cement Liner machine. The work involved extensive on site investigations producing sketches and mark-ups of the existing installation and wiring.
Krupp Engineering (Australia) Pty Ltd
Bulk materials stacking and reclaiming machines for mining companies such as BHP, Alcoa and Mount Isa Mining. Each machine would require approximately 80 schematic, termination and layout drawings preparing involving 6 months work for a designer and CAD operator. Preparation of specifications, contract management and site supervision also carried out.
TiWest
Steam load shedding for co-generation project. Prepare loop diagrams, DCS termination diagrams, cable schedules, PLC cabinet G.A. drawings and specifications/scopes of work for installation.
Western Power, Regional Power Division
Broome Power Station SCADA system. The system involved the installation of 21 Power Monitors into 11kV generator and feeder C.B. panels and RS485 comms. link to P.Cs running SCADA software.
Western Power, Regional Power Division
Kununurra 22kV Sub-Station.
Design drafting, preparation of contract documents, specifications, scope of works etc. for the following works carried out in preparation for the Ord Hydro System coming on line at Kununurra.
Power Monitoring and Supervisory System.
Modifications to existing 6.6kV Switchboard for installation of 10MVA Interconnector
Installation of complete new 22kV Switchboard and Switchhouse.
Installation of 5, 7.5 &10 MVA distribution transformer substations.